Show CITY HOLDING BACK WITH I UNDERGROUND WIRES During the session lon u of the board of or public works Friday night It cameto camo came tl to light that dial the city t a was holding back Iho tho work reek of or placing I the telephone un underground In the paved district d- d The rite fIre alarm and police alarm wires arc are strung trun on the lops tops of the thc Hoek Rocky Mountain Bell Telephone company's company's com com- pany's poles pole and until they arc are mut- mut muted moved c ed nothing can bo be o done The lire fire alarm system to bo be Installed is still pending on account of or tho thu city's financial 11 Ii- straits On this account the work of or removing the poles from tho the ml middle ello of the sleet is delayed and for months to conic come there is i nu no pos pos- JO f show allow to get tho mho work done Tho Thu Utah Ulah Light LIht Railway Hallway company company com com- IJan pany asked for fOl locations for poles on Ih the sides side of or the thu streets on First South Second South and Third South st lI eol GIl City Engineer Kol Kelsey c was requested to tu furnish the locations so the thu poles could be removed front from the center of the streets sill eels The com company pan will prepare prepare prepare pre pre- pare l First South and Third South streets for or paving now The poles on Second South street are a ar to be removed j a as as the steel led poles arrive c andare null and are arc placed In permanent Ilo positions On tho Iho other the steel poles pole have h been heen ordered and temporary temporal poles pol- will be he placed on the sides Tho The hoard board of public works work opened ono bid on un the crematory Improvement o It Il was from the Dixon Engineering Construction company compau o of Toledo 1 Ohio and anti was for Tho The con con- calls for 01 five n additional tract R furnaces The Tho bid bill was aK recommended to lo the council for fOl n award rime Tho board of or public works worl received several w communications from Crom property owners a asking I about Improvements which had hall been heen left uncompleted The board took no d definite action on un thorn them It was practically passed up to the time I council to decide |