Show SALT LAKE ROUTE TORUN TORUN TO TORUN RUN INTO CALIENTE Line Has Been Sufficiently Repaired Repaired Repaired Re Re- paired to Do Away way With Aith Stage Ride It If I la is expected that tl ti ains on un the he theall Sait all Lake Route wIll A he be running into Caliente from fi this end endt of the line hue today oday or tomorrow The Thc t large laric force of oC workmen which has been laboring incessantly for several weeks have repaired re- re paired pahe the thc line hue for tor or trains to o pass although it will vill be bo tome some time lefore the tho ballasting work can be Q com com- S 4 s Since the tho flooding Hooding of th the roadbed causing cau cessation n of through h trains rains have been running 1 from Salt Lake alto to Acoma Nevada connecting ts a sta stage e which carried passengers on to a distance of about 15 5 miles miJe With 1111 the opening opening- of or theline tho the tholine line ine to Caliente the stage stas-c service cr will willbe willbe be stopped Ic Few Feit w details of the tho repair work on he damaged ama cd track have been obtainable obtain obtain- able lo at this end of the line owing to he tue fact that the leading of or he the road have o been een at tho tile point of or trouble rouble and it has therefore been een unnecessary un umi- umi necessary to send detailed reports out It t is understood d at tho the local s however that the lie line will b be repaired i and amid through resumed April 10 10 unless U some unforeseen emergency riser arises a |