Show PROM I rIl THE L I AMALGAMATED Chief Engineer n at Company UI I Ut BI lug His Montana Plant In Iii II Town o n Yesterday Tarrying In iii Salt Lake between trains during the day ca wa was C. C H. H Ito Re- Path chief engineer for Cor time the Amalga- Amalga maled Copper COPPI com company pan at al Anaconda Anacon da in Mont Mr r. r acknowledged le ged as one o of the leading engineers of the time world wOld Is IR on his 0 way vay to lo the thc east to Inspect In- In sped time the new nw electrical equipment which has been nr ordered erE for the further fur fur- titer ther Improvement of tim tho big plant at nl which he presides C anti and which I Is to lo lobe tobe tobe be forwarded COI for ot Installation In iii a short time At the plant there re Is being rc reduced a larger large tonnage of or copper copper- bearing ore on that nt at an any period In Its Is and that the time will close hl history tory anI year ear wi upon th the biggest l kind of an output I Is already assured |