OCR Text |
Breaks Rim im Road Planned For 1935 A brief outline o of the he plans for de development development development de- de of Cedar Breaks National Monument was given last lut week by P. P P P. Superintendent of the monument In a talk before the Parowan Parowan Paro Paro- wan Chamber of Commerce These plans as reported by by the the Times are as follows If his request for funds Is granted he said and his recommendations ac accepted accepted accepted ac- ac will be expended duing during during dur dur- ing the coming season In the construction construction construe tion of a rim road around Cedar Breaks to the north boundary of the which is somewhere West and slightly North of Brian Head Bead Inn He expects also to develop a camp campground campground ground In the area to fence the boundary line for the protection of ol the park and the assistance of the forest reserve who range livestock in that locality to start some trail construction down Into the Breaks and to do some fire protection work within the monument Much of the work he expects tt to have done by a COO stub camp of men which he hopes to have there during the summer Asked as to the possibility of the parks park's doing any ro road d construction on on approach roads he said the Long Cedar-Long Valley road has been designated as an approach road and will undoubtedly be ed This project may require a three or four year program he said ald and until It Is completed there Here ere Is no hood of any other approach roads re receiving receiving re re- consideration |