Show I Remodeling at B. B A. A C. C I Well VeIl Under Way Work of remodeling buildings at the Branch Agricultural College Is well under under un un- der way and the improvements are expected to add greatly to the convenience convenience con con- of the buildings The expense of the work Is ls being met by the appropriation made by the last legislature to make these needed Im im- Considerable work is beIng be being being be- be ing done on the ventilating system and rearranging of some of the class rooms The Directors Director's office and the faculty room room Is being changed and Improved The office will be more privately lo located located located lo- lo and the old office used for the new faculty room while the old faculty faculty faculty ty room will be used as a a. girls girl's room Work on the reconstruction of the Dormitory building recently destroyed destroy destroy- ed by b l-e l fire catly y in l July July when the insurance insurance money will willbe willbe be available available It Is expected that there will be no dormitory at the school this year as the old building Is to be re reconstructed reconstructed reconstructed re- re constructed as a mechanical arts build build- ing |