Show PERMANENT ORE BODY ENCOUNTER ENCOUNTER- IO ID AT MINE BIM R. R A. A Brown of Salt Lake City chief engineer of the Uncle BIm MinIng Mining Mining Min Min- ing company went to the property and made an extensive extensive survey of of the work that has been done In sinking the main shaft to the foot level and driftIng driftIng drift- drift Ing to the main break One year ago Mr Brown drew plans plans' for the operation of the mine and outlined the directions direction and distances to togo togo to togo go in order to tap the main ore body and Thursday the miners at about at-about about the exact distance set by the engineer tapped tap tap- ped the ore it W being of exceptionally high grade During the sinking of the main shaft ore seams and pockets have been encountered encountered encountered en en- countered during the e entire Ure distance as was predicted by Mr Brown and the theore theore theore ore b body dy opened up at the exact spot he set for it Work will continue during the winter winter winter win win- ter according to Mr Smith president of the company who was on on the Pr property prop property prop prop- p- p erty with the engineer and ore taken out and stored for shipment In the spring From the size of the vein encountered encountered encountered it ft is bell believed ved that within three months enough ore will be taken out tomake to tomake tomake make a shipment of nearly cars which will be sent to the smelters in northern Utah |