Show i NOTICE TO W WATER USERS State Engineers Engineer's Office Salt Lake City Utah January 21 1925 Notice is hereby given Riven that the Dixie Power Company whose principal pal al place of business is Cedar City Utah has made application in accordance accord ance with the requirements of Section 8 Chapter 67 Session Laws of Utah 1019 1919 to change the point of diversion of Twelve 12 c. c f f. f a s. s of water diverted di diverted di di- heretofore from Coal Creek at ata ata a point which bears N. N 59 deg 8 min W. W ft from the SW corner of Section 16 T. T 36 S. S R. R 10 W. W S. S L.M. L.M. L. L M M. and used to operate a 90 K K W. W single phase 2300 volt generator for furnishing light tight and small motor power in Cedar City said plant being operated under a head of ft It ItIs Itis Itis Is is now desired to divert the water at ata ata I Ia a point which bears S. S 52 deg dec 43 I min E. E ft from the SW cor Sec 16 T. T 36 S. S R. R 10 W. W S. S L. L M M. and c convey it it I by means of a ditch a distance of ft and use as heretofore heretofore heretofore here here- for the generation of power This application atlon is designated Inthe in inthe inthe the State Engineers Engineer's Office as File No All protests against the granting of said application stating the reasons must be by in duplicate accompanied with a fee of and filed in this office within thirty 30 days after the completion of the publication of this notice LLOYD GARRISON State Engineer Date of first p publication January 23 1925 Date of completion of publication publication tion Lion February 20 1925 oo |