Show During Dining the rec recent t adjustments of at j business of the Columbia Steel plant at Iron Springs Ed Parry of this city has taken over the contracting work of the big tunnel and again has installed a full working force of ot men in all three shifts so that the working of the tunnel will be a co continuous drive the full fuU twenty-four twenty hours For a short time the force was cut down to two shifts in order for the bett better r blocking out lut of the ore bodies and to facilitate better shipping A number of other contracts have been let on the adjoining for sinking sh shafts shafts' f i and drifting which will mean that in a short time all aU the main company workings will be connected connected connected con con- and already a network of rails is under underway way for the quicker handling of the ore out through the big Dig tunnel It is all hauled out now by electric e trolley and tram cars each holding five tons |