Show f M r 4 NEARLY COMPLETED I o Plans for the Coal Creek stee atee steer r bridge and abutments project thaI tha thai I 1 has been on the tapis for over a yea Teal r are are practically completed to j designs on the abutments being preEL prepared pre EL t pared at the present time in orde ordel r that bids may be received on tin thE e r cement rubble masonry t They will wilt be submitted to the th o I bureau within the next two weeks and end it is possible that construction could be started at such time in th the e month of February as to allow the i Construction of ot the abutments before high water of April This Thill work will necessitate the employing em cm- of a good sized forgo force ore of ot men t and it Is believed that before the of February rolls around men menI I will be busy hauling cement gr gravel el and coble co e stone stono as well as operating two or three large cement mixing machines The bridge that will wUl span the coment co- co ce cement cement ment rubble abutments will be of re reInforced reinforced re- re steel entirely and will cost COlt costin in in the neighborhood of including in In- In eludIng the abutments |