OCR Text |
Show Drainage and Street Grading. The contract for digging l lu trench and Uylug tin; tiling for the .iraiuaL'c system on Factory street has been a-warded a-warded J. C. Cutler and James II. Our-banatl Our-banatl of Snowvllle; who with n force of men have been busy this week putting in tho drain. The depth of the trench Is 3 feet ami they contracted to dig tho trench, lay the tile and cover it In for .1 cents per lenlcr foot, said bid bclng no-cepted no-cepted by the Town Hoard. 0 Inch tiling til-ing Is being used. The work began Monday on the east end of the trench on Factory street mid has been progressing rapidly each day since. Up to the hour of going to press the drain was 'aid within n Btone's throw of our business blocks. In conversation with Mr. Cutlor we wero Informed that they expected to hove thu drain all in by the middle Jor latter part of next week. The grading anil graveling of our town streets Is being done just ns fust as men and teams can be secured to do tho haul log. Ero the winter season sets In our town streets will be In excellent condition. |