Show IMPROVING THEIR CHAPEL GROUNDS the bishopric and members ot of the perry ward are malting making some fine improvements prove ments on the grounds of the ward chapel A cement retaining wall has been constructed along the entire west wast front on the property line and built high enough so that the depression could be filled in to level up the grounds with the bottom step at the chapel entrance trance eti instead therefore of 0 continuing the natural slope ot of the country the soil at the rear 0 of the chapel has been plowed up and scraped around to the front to build up that part and make a seed bed tor for a grass plot A halt half circle roadway entrance and exit esit has been provided at the north and south ends ot of the retaining wall and wide steps immediately west ot of the chapel entrance are provided tor for those who walk to the meeting house the plan tor for the parking of 0 the grounds was furnished by emil hansen expert gardner ol of the utah agricultural 7 college arid and it provides tor for grass and trees the question ot of water may prevent the extensive expensive planting of 0 grass and shrubs but the leveling of the grounds make an all improvement that Is more than worth the cost |