Show sevier sr VIER CANYON ROAD PROJECT IS 13 STUDIED proposed plans and specifications for tile the construction of miles of federal aid highway in seller canyon on U S 89 between the railway station of sevier and the pluto plute county line were submitted monday hy by the state road commission to the tho district office of the united states bureau of public roads at ogden if the ha proposals are approved by the federal engineer the project will bo be ready for advertisement in about a it was asserted by K 0 wright assistant engineer of the commission it was also announced that the plans and specifications for tho proposed project from fairview north to hilltop Hlll top in ill sanpete county on the samo same highway will be ready to go to the bureau a week or so later this portion of fhe ho federal aid highway Is nearly 10 miles long with these two projects constructed there will be remaining to complete U S 89 from thistle utah county its official northern terminus to the utah arizona line on the way to the marble canyon bridge over the colorado north rim hill of the grand canyon national park only three stretches of highway below federal aid standard ono one of these about eight or nine miles la Is between ortons artons ranch and Pan gultch in garfield Gartl eld county with being spent on the north 7 of at a milel n this section as aa a state betterment project this particular road la Is already of a reasonably high standard there remain also about seven of highway between mount carmol carmel and glendale kane county that Is below federal aid standard at tho the north end of tho the highway about 20 miles remain for future consideration between hilltop and thistle between ephraim and spanish fork ho however there Is an alternate route running by way of moroni and fountain green to N ne and north on U S 91 salt lake tribune |