Show in talking with contractor A G johnson regarding reg aiding the mill lie he informs us that ho he Is only waiting tor for the weather to settle so he can got get busy and work out of 0 doors most of the machinery Is either elther here or ou on the tha road erronte to Pan gultch as well as aa several car loads of building material which he will have to get ready to house as soon as possible there la Is some probability of him chan changing jing location from the first announcement and by the time the weather settles he ha will install the business which will be of great benefit to this section |