Show some ore showing in apex standard drift 0 owing to difficulty in furnishing air for both north and south bead head ings on the apex standards level the work in the south dritt drift has been temporarily stopped supt bupt merriman Merrl man says that bis his men will now center their attention on the main north drift and a crosscut to the east this crosscut will follow a very promising break in which there are some good alues mr merriman Merrl man considers cons ideis the east crosscut a very promising piece of work but says there are other breaks cut by the north drift which how more ore all of which will recene attention datt atlon in due time something like 1000 feet of has been performed in the north dritt drift and on the level of the apex standard and the south drift hat has been driven almost the same die dis barce |