Show government approves nephi surfaced road 0 construction of the hard surfaced highway from nephi to the utah county line has been accepted by the federal government the road corn com mission was informed a few days ago the acceptance by the state toad road commission is expected at the next session at which time the roaf road will be officially turned over to huab county for maintenance the roa road has hasa a hard surface of portland othe t ala d ea concrete six inches thick th ck av over er fl a yi width of eighteen feet for the e eltiy r len length th of 15 53 miles shoulders mil gravel surface have been bull three feet on each side of ot the road making the total width of f the road twenty four feet the final inal cost of th the road has not been computed yet the contract price was 07 of which the county s share was only 2 G per cent the balance being put up from federal aid funds |