Show iron ion king company Is driving drift on 1200 0 what promises to be a very im piece of development work has just been taken up at the pro perty of the iron king mining pom pany in the eastern end of the dis brict a dritt drift being driven out toward the southwest from the main shaft at a depth of ISOO feet heretofore the campaign of development has been carried out on the 1565 and 1000 levels and the showing at these points In indicate dicato that there is an ex good opportunity of get ting into an ore body on the 1200 level it Is this drift on the 1200 level that the zuma people expect to connect with some time during the present year A large amount of good iron ore Is being shipped by the iron king I 1 and the he revenue from this ore Is meeting the other operating es ex benses |