Show eureka standards old shaft being enlarged 0 about a month ago work was re in the shaft of the eureka standard company this ground be ing to the south of the tintic gintic stan dard and cont controlled 0 by the latter the old single compartment comportment shaft having a depth wt about about feet la is now being ed and enlarged to standard sizel sizel this work Is pro grossing gressing in a most mot satisfactory man ner and with one shift of but five men it Is possible to make about two feet each day the eureka standard Is pretty well equipped tor for development work and while the present campaign Is thought to be in the nature of assess ment work there Is a likelihood of it being continued E J who controls the property Is anxious to thoroughly prospect the ground just as soon as mining conditions are more favorable the property baa has connection with one of the east lines of the utah power company and is equip ped with a large co compressor and air hoist |