| Show power line being built J to the eureka standard 0 arrangements have been made for 0 the immediate 7 construction of a pow er line the property of the eureka aff aviv standard few company wi ys where some development work Is now under way ayr the shaft r at this property Is af being re ieffa timbered and enlarged and new ff electrical equipment will be install ed afa the ground wiy lies to the south ia afaf of the standard and 11 J rad datz Is in control s he says ja aw that yAy the aff present campaign of work Is in y the nature of annual assessment but that there Is a possibility of it being sy OSs con tinned after 0 the amount required for wy this year f effay has been completed y fw about faava fw four ava hundred W feet vy of new 9 power 2 ilae will be needed to connect I 1 the eureka wiy standard workings aiss with the waff line which 1 wiy some waff time ago was asi aff built kat between the 7 gintic tintic and the south standard at ff |