Show new si hoist being installed this week 0 lehi fintics cs new equipment az will vurr be in running azy order within few days hoist will fy be good for 1200 or 1500 wy feet jar 0 7 the small hoist which has 06 been va w in use since S shaft work tw was started VW months ago at the w lehi tin imy tic reached i its limit this week jf and fortunately the new iffa jaffy equipment ar a ra ed the other 0 afar day the ji new hoist v fay nas hauled over to the property fr yesterday and as the foundations T were dwir ready ff to receive it ff the shaft w work will be resumed within w two or three days mefa manager awley charles zabriskie w says ff that the shaft has a depth of feet w and that work has been going 7 riecy along in a very ibatao 37 factory manner notwithstanding say the fact that y but one shift Is used bov wibb the a new waff electric fi hoist purchased AI from the denver engineering works aff ayrer s sinking t can be carried on to a depth faya fw ya as 7 of 1200 or 1500 feet 7 from w present ey indications V a depth of or asas feet should be sufficient wa to ff reach ff deposits of commercial iQ 0 ore in this 7 property |