Show chiefs new shaft down distance of 1165 feet 0 manager iff cell a I 1 itch S of the chief cons reports s the new shaft isow at a depth i of 1165 0 feet with kiy the work 7 stopped ff temporarily ff er in is order swi to per mit carrying the concrete z work on down to the 1145 aw foot point i the shaft work Is now progressing more rapidly 1 than it was some months frow ff back owing to af a decrease in the flow of water iv much of the water which vias developed affy aay in kinling 7 sassy the first few hundred ewt feet of the shaft i fis fryy Is be ng cy drained iv off through jf wy the ff 10 connection and the 0 pr besent Is not in isri excess ossy of 65 gallons w per min ute mr fitch states af that ja the vinze is being sunk to the next good ore bearing limestone 2 the bottom of he aa being jaff about feet below i the 1000 anivy level the officers iffa of W the 7 company have lW laff no ff intention of stopping 7 jf 7 the work on the 1400 aji level of sasi the 0 but they intend to ex tend Ww their prospecting operations to greater depth |