Show machine drills will be operating on january 1 henry barney who Is superintend ten ding the work at the tintic drain tunnel says that by the first ot of the year the machine rills drills will be op crating in the face ce ot of the tunnel work Is now go going ng 0 op there but the tunnel has not ro essed far enough to get into sol or mation and con antly the drills are not in use the new drain tunnel Is fully equipped with all needed machinery and it Is understood that three slit shifts its are to be used commencing january first |