Show leasers working in south end of the iron blossom ashert A short 11 time me ago the leasing tern tem was adopted at the iron blos som mine niffie and at this time about twenty blocks of ground in fit known as the no 1 section of the tile mine are now hi ili the hands of the leasers this leasing work Is being done in ili the older part of the iron blossom in ill and around the old slopes and from present indications leasers teasers will be able to make money for themselves and also tor for the mm mill ing company most of the ore chii h the iron blossom company is shipping is now coming from the no 3 workings where the new copper deposit was opened this copper ore has been found to be continuous from the level down to the 1200 and the man mail rf do gement Is now doing some prospect ing for the purpose of locating the same oie ore on the 1300 level in ad dialon to the high grade product which is being mined principally from the north end of the mine the iron blossom Is taking out consider able low grade ore which Is being treated at the silver city plant of the tintic gintic milling company two crosscuts are being driven in this mine under contract awarded some time ago to walter fitch pitch jr one Is going out toward the east on oil 1100 level where there is an im pa t an t p piece bece of ground which the 11 prospect inan n BI blossom 0 asom people are anxious to prospect while the other drift is be ing driven over toward the tintic gintic central from the 1700 level of the mine another hundred feet should take this drift to the lines dividing the iron blossom and tintic gintic central |