Show smelter unable to take normal output of chief just when things were moving a long at a very ver satisfactory clip at the property ot of the chief consolidated mine an order was received which stopped the shipment of ore to the alart t of the international company at 1 boele I thia this v ft III mean light ship ments merits from the chief until such time as ali the embargo Is raised it Is und erswood that the difficulty at the smelter Is out a temporary one and that the congestion of ore kill III be cleared cleard up within a very few days fhe fact of the matter la Is that the ellei abi all avex over the state are prodoc ing arge quantities of ore and that tie 11 e smelters are having trouble in ke g up with the procession A V h n the ore piles up too fast tl e big shippers are forced to ease up a bit everything very thing Is now in excellent sape pe at tl it e chief and the manage ment regrets that it Is not possible to ship all the ore that can be pro duce I 1 |