Show tintic gintic standard has TT big bip force in addition to the mine work the company is putting up buildings and preparing for winters campaign of work john the superintend ten dent ot of the standard mining company a property was in from the east section during the w week and states ahat that the he work Is nept itaf ua f put for the present week sho should u amount to three carloads the same as last A eek quite a force Is being aed at this mine but about halt half of the men are at work on the surface putting up buildings and getting everything in shape for the winter s campaign A shaft house Is being constructed at the new shaft the ore house Is being enlarged and it la is the intention of the management to put up a blacksmith shop and bunk house mr Wester dah says that the new blower fan has b been en delivered at the mine but that lawill not be installed for a few days when the bad air drives the men from the mine they can be put to dvork vork on this job the fan Is much larger than the one which Is now in use at the standard and it Is thought that it will be ample to ventilate the work ings it can be used either as a sue tion fan or a blower while the mine is now producing enough ore to load a car about every other day the management hopes to be able to increase the tonnage to a carload a day as soon as the new tan fan goes into commis commission cion manager states that the ore body has been opened consider ably during the past few weeks and that the values are as high as they have been at any time since the standard made its first strike ore which Is now being shipped is bring ing close to 1500 per carload A contract has been let tor for the sinking of the new shaft but the men who have this piece of sinking have been busy on preliminary work they will use the air hoist for the present but the new hoist will no doubt be delivered and installed soon this week the utah power comp company anys s force commenced the job of extending the power line over to the new shaft as the equipment Is to be electrically operated the shaft contract was awarded to andrew sutherland and the flink brothers and it is the intention of the company to continue sinking un til a depth of 1300 feet Is reached which will permit the connection be I 1 tween tl e present deep workings and the new shaft and give the mine a al proper outlet tor for its ore |