Show leasers at work in the upper part of gold chain in addition to the extensive opera tion which are being carried on in the gold chain mine on company ac count some leasing is permitted in the upper part of the property above the main tunnel level it was only recently that leasers were allowed to commence work in the gold chain ground and that part of 0 the property in ili which their work Is being done is really the surface workings of the mine it is most too early to make a prediction re garding the work which the leasers are doing but it is stated that there are some nice bunches of ore in this leased ground during the past month the gold Gol cl ain aln shipped a couple of cars of ore from that part of the property which is be ng worked through the 1500 level of the lower mammoth but aside from this the mining opera eions are confined to that part of the mine which is between the and 0 0 lei levels els a thomas tregoning who has a lease on the dump of the gold chain mine has some ore the past few weeks |