Show installing new ew culbert cull eft during the past week the city road supervisor aal an 1 his assistants commenced work on oil one of the cul cut verts near tle tl e mere store the culvert conveys the vater water which runs along the northern side of main street under chi ach street crossing and was in a very bad con being so thoroughly clogged with sand gravel and rubbish that it was imort impossible tor for the water to aock mork its way through the culvert which is now made of vi ee eel I 1 is being demolished and the ditch will be scraped tree free of debris alen tl en concrete sides will be erected and 1 plank top put on this shoals make a suitable device for carr carrying ving the water and the road supervisor and city council should be thanked for promptly adjusting such affairs which exist in eureka |