Show emeralds boiler boller installed development work worx under way at the emerald property at mam marn noth the new boiler has been install ed and it vaas wa used for the first time a fe days ago the development of the mine to g being carried forward as usual but the company is a using only a email small force the tribune of a few days ago had the following article regarding the emerald ahe mineralized zun odthe of the emer aid ent entera b that property from the end lines of ahe e centennial eureka and traverses ahe he emerald for a distance of feet pot F 0 the purpose of exploring this ea zone a cross cut was run all fro ithe the foot station in a northwest northwesterly I 1 direction anufrom and from the crosscut aate ate it had tap tapped ped the mineralized zone a drift was mas started south for a dista data ice ce of feet at the foot pom this drift about four inches of iron run ning east throng i the foot viall A crosscut f tr im m the drift was started with the of following the iron through the foot ivall which when in about eighteen inches en countered the north edge of the ore body in driving the crosscut ahead it reached what appeared to be the true wall ivall of another fissure it was then decided to drift southeast along the foot ivall following the ore this has been done and at present the ore body is widening out as the drift progresses according to the estimates of the engineers the west drift on the foot level which drift has been teen driven about feet is approximately feet south from the ore zone it will be driven ahead to tap the ore body the property was visited by a part consisting of offic als from the eagle blue bell who a after e in vesti gating the new strike ex expressed essed themselves as surprised and pleased ae sed v vuth ith the conditions and the showing |