Show i new work will be taken up tomorrow at dragon for some little time all of the m work ork tor for the development of the i dragon has been handled through the iron blossom workings but tomorrow vork nork will mill be resumed through the dragon dragons a shaft frank B ach assist arl antna 6 1 mger ger of the inight night proper U 1 K for fot th that the dragon company will take up the work where it was left off on the 00 level driving the drift which fol followed lomed one of the breaks over to ward the martha washington vein this time the arif drifting tine will be con tinned until that section of the drag on ground is pretty veil yell prospected at a depth of feet I 1 when th s piece of development v ma as under sunder way last fall several small bunches of 0 lead ore were cut and the officials of the dragon feel quite sure that they will get something much better aa as soon as they reach the martha washington vein water for the operation of the knight christensen mill is being tak en from the dragon mine |