Show tintic gintic standard will be shipping within two weeks john esterdahl who is tending the work over at the standard property states that he has just fin shed cutt nv out a sta I 1 lion ion on the 1000 level where shere a larger engine will be instilled installed preparatory to 10 ho stin the ore from the 1100 and 1 00 level 1 veli ail a it p t wll w 11 probably auly tn t vo we Is C cs 8 before fhe the standard is in shape foi ore pro product act on th on the lover faeh vets 0 of th mine ind cates t tb it t it atwil wi 1 b ble ule to s n nd I 1 out t tv i 0 me e ca load 0 ore a donth non trout alchi ith ay ua it is a little early to I 1 inake sui la ha a predict on all al of envelopment work mork with the except oa on of the drift on the 1000 level has been stopped while the preparations are bein beina male tor for the shipment 0 the ore thit hn hai alcaly b en ell open d up tip |