Show using two shifts at the knight christensen mill reports from sliver silver C ty indicate that the knight christensen mill is taking care of a very nee n ce tonnage of ore and that t 0 shifts are em aloyed within the next week or tm two 0 the third shift will be put on and the mill will then b able to handle one hundred tons a day the plant seems to b doing doingo very satis sati factory work mork and mr chistensen feels that he has overcomes all of the difficulties connected with mith the treat ment of the lo 10 v gradei grade ores of this district for the present the ore that the mill is treating is 13 being bein taken from the big tunnel at the dragon john ed yards the president of the sultana mm min ng company of est tin tic was mas in eureka recently after a trip to the mine and wh ie le here he made the statement that eions are now being made for the re opening of the property last acar the property was worked m i ader lease by local mining men and some ore was mas placed on the market mr ed wards is ait authority hority for the statement that a small force will be placed at work for the development of the lower portion of the ground below the main tunnel |