Show EMERALD NOW READY FOR WORK ON 1100 L for the past two months the em erali company baa has had a small force of toen nen at work mork in the man ma n shaft putting the shaft limbers timbers and gu des in first class elass shape in order that work mork can again be taken up on the mine mines s deepest level the 1100 supt bupt ed ward oke states that this job is now practically finished and thit that within the next week active operations will be resumed underground on 1100 level a drift will be pushed out toward the fie north per haps 1200 1203 feet and then a w 11 be slink in order tor td reach an ore de posit which he says was encountered during the t my that the emerald was operating f from om the 2030 level of the apex remembered Ye it will mill be fe t that hat the emerald people people did considerable deep P prospecting during the time ahat they had th use of the apex shaft and machinery and that a disagree ment between the two to companies brought this work to an abrupt close something 1 ike ke two months ago the force at the emerald is just a little bit phoud of the record which they have made in the re timbering of the main shaft about 10 feet of timbers having been put in place in one month and nine days this ie cord for rapid timbering will no doubt stand for some little time |