Show contemplating ROAD the board ot of county commissioners ot of this county have been in conference recently with the state road commission relative to completing the highway between willard and hok hot springs frem the north end ot of the road to willard the state road commission is urging that the road be finished with concrete like the two stretches in davis county and the estimated cost would be approximately which is at the rate of 12 1000 per mile the local commissioners have taken the matter anler advisement for there are so many things to consider before de finate action is taken the enthusiasts for the road point out that when once constructed the cost of if upkeep is eliminated for years to come which really makes the concrete road the cheapest in the long run at the same time a concrete road provides a highway that meets evry ev ry requirement in every kind ot of weather and is always open to the heaviest kind of traffic it is also pointed out that the forward movement ment in road building is to construct concrete roads as all other formulas have been found wanting and have proven expensive experiments concrete will last and wear indefinitely and when it begins to wear or break i the cost ot of making repairs is not so BO great as in other cases case it har not yet been decided what shall he be done with the hot springs willard road except that it must be repaired very shortly and as soon as the commissioners can make up their minds which is the proper tiling thing to do the work will commence |