Show diamond drill at dragon the diamon I 1 drill which is to ie e used in acting the south end of t the lie di deagon agon T aroi rol erty is now ready foi opt operation ration and sinking will I 1 perhaps I 1 un underway deray eichel to lay or tomorrow ow by the use of this dull the deagon management expects to get a line up on the underground conditions in tl 0 company s extensive mineral tory during the week a tunnel was also started upon the dragon ground the portal of the tunnel bung located but a short distance hom uio the corn com pany s main shaft bioni which tho saip shipment enta of iron oi on t u ei e taken |