Show CUTTING DOWN THE STREET the 0 L 1 I R it co ca has had a force ot of utah construction co men complete the leveling of the east side of 0 fifth west between fourth and sixth north streets the dirt from the cut being used in filling up tile the street across the old creek hollow which is now leveled up to the track grade with the exception of the t h eju ra broad bridge by lengthening out that bridge 10 to lo the east it will not be necessary tor for traffic going porth north and south t to cross the tracks at that place at all the west side ot or the track will likey likely be treated in the same manner after which the street will be a thing oi of 1 beauty |