Show sinking under way jb j centennial eureka again sinking main shaft t i v biffi pt mp for ff lesa bandh 9 water ly sinking has again been resumed in the main shaft of the centennial eu reka mine some time ago the corn com pany let a contract for feet of sinking which when completed will give the mine a 2 foot shaft water was encountered betheen beaw een the 2 and 2 levels and it was nee cessare for the company to install a sinking pump this pump is now handling the water which at the present time does not amount to two gallons per minute and on wednes day the contractors resumed work in the shaft they are now handling the sinking by days pay but as soon aa as the company is able to determine what will be a fair price for the work brother arother contract will be let the past year has been beep a very sue one for the famous old cen tennial eureka mine as shipments have been continuous throughout the year supt bupt brown has not only been able to keep the output up to nearly fifty carloads per week but he has also kept well up with the develop ment work and noth the I 1 the immense amount of ore which has been sent out daring the past I 1 I 1 t twelve welve months the ore reserves have been increased rather than diminish ed what makes superintendent brown feel better than anything else is the fact that the mine has had no serious accidents during the entire year m which aich has just closed considering the large larze number of men upon the corn com pany s pay roll and the depth at abic I carried on the centennial eureka company has been extremely fortunate in the matter of accidents ai at d this can be attributed I 1 to the splendid equipment of the pio perty and many safe guards which mr brown throw s around his employees whenever possible |