Show now sinking shaft everything is moving along at a pretty lively clip out at the fast tn tit tic development company s mine and manager mana er palph kellogg kellog expects to ha han a the haft down to a depth cf feet by the 1st of october since sinking waa was resumed a few dave davs ago the shaft has been drapl ed down 1 6 about forty feet making the present depth something om ething over feet IN athen aen asked regarding the new dew strike which v N aa as made on the foot level early last week manager kel rel logg stated that four carloads of ore have already been taken from this A new ore body two of these cars werl were sent 1 out to the emi smelter elter during the A latter part of last m week eek and enough ore to load a couple more cars is now in the ore bins at the mine after following the ore for about ten or fifteen feet toward the north a fintel wintel is now being sunk in this north drift the object in sinking this wince is to determine the true course of att vein in order that it may be possible to run in and tap the ore fro n the level below belou a |