Show record breaking breaking shaft sinking I 1 the eagle blue sell bell company closed the month of august with a total of feet of shaft work to its credit thia this was accomplished by sinking and rasing raising and bupt supt NA illiam owens expects to cutout cut out the tor br more feet necessary to make the he con lection and ga give e the company 1000 feet of shaft before the end of this month the new hoist at the eagle has been tried out and found to work per perfectly factly the thi old hoist will mill how bow ever will be used ur til the connect ion is made in the shaft when the new plant will DO te placed in operation the new shaft will give the mine splendid ventilation and will enable the corn com pany to handle the ore much more economical 3 v in raising from the 1010 1 foot level for the new shaft a body of good ore h was opened up thu taase was in ore for a distance of 40 feet but no effort wai 11 made to determine the extent of v the new ore body but as soon aa as the shift shaft ie is completed to the 1000 level this ore will be given attention |