Show new hoist tried out yesterday the new hoist at the eagle t blue bell mine was tried 0 it and everything went aa as smoothly as possible the eng ne is 15 h p and D R bekim the master mechanic of the Bing hain haia mines people is de lighted with its behavior and states I 1 that it could develop even 00 h p some delay u was as experienced in getting the hoist in arki working g order but this was the result of desultory del deliveries iverie S of parts ordered and annoying delaa dela 8 in their transit owens I 1 leporte that the station on the foot leela leel 4 14 cut in acu M r it aja f that ait from t the r e bottom ottom of the shaft the raibe has reached a d stance of feet |