Show will sink to the 2000 level leve I 1 after cutting out a stat on and g a drift upon the lei leel el of the no 1 shaft of the iron blossom mine th tha sinking of the main shift was taken up again today the small engine with which the shaft work is being handled has been mooed from level to the 1700 level and it is understood that sinking is to con dinue until the shaft reaches the 2000 level supt bupt cl 01 arles aa r skie states that the ore bodies are op ning ding up in nice shape at both the no I 1 and no 3 workings mor kingg and that the mine is send mg ng the usual amount of ore to the smelter each week meek the drift flora flom the foot level of theno the no 3 shaft is it 11 som something like feet and while some ore has been opened at this depth the deposits are not large and it is quite probable that a will be si st from this leve leve the te s r king of tl ti is may start at an early date |