Show will drift on 1700 level i 0 at the iron blossom mine the usual amount of ore is being mined from both loth the no 1 and no I 1 w mornings or ing the bod body of gold ore bich m as en ell countered so ne rie time agn ag upon the 50 1 level of the no I 1 lor or south workings of the mine cont nuee to open up in nice shape and shipments of this ore are going out each day the no I 1 shaft is now down to a depth of about 16 5 feet and by the first of july jul the preparations preparation tor for drifting from the 1700 level leve lill v ill be under way w ay it is barely possible that the shaft work will be temporarily discontinued after the 1700 level shall ha h ai e been reached |