| Show road open again last saturday night the evening train on the rio grande ry was brought into tintic gintic over the new bridge wh rh ch ell was constructed to take the place of the oi 01 e destroy ed by fire the bridge was not entire ly finished on saturday night bight b it b by holding the train back on the other side of he bridge for a V few hours the rails were w ere put down do n and the big frame structure was reidy reid for tempora rV use bince since that time the brid bridge ge crew has been busy putting on the finish ing touches and at this tune time both pas and freight business is being handled without interruption |