Show will reopen in june open for through traffic not later than june 15 is the slogan that has been adopted by the engineering for ces and the construction companies which are rebuilding the salt lake route through the meadow valley wash district the belief that through traffic between salt lake and los angeles will be resumed ua D the middle of next month is 18 based ou on the progress that has been made rebuilding the roa I 1 there are but two gape gaps to fill of a total of about thirty seven milts work is ben g pushed at the rate of nearly a mile a day three mrk trains and crews cres that are Nor working king from acoma have reached a point fourteen miles west and within ele eleven en miles of caliente Other 0 ther crews work ing from caliente are now about teen miles west crews crem s east ft fi in moapa have progressed sixteen miles leaving a gap of about twenty nine miles to be closed on the los aag it s di division ision |