Show at the beck tunnel I 1 according to assistant superintend ent perry perr auiler drifting is still in 1 progress upon the 1100 level of thi beck I 1 mine some prospect is also being carried on at a depth of feet in the new workings and some of the ore which is being shipped is also algo coming from this level the bulk of the ore which is being sent out from the mine is however corn com ing from the old workings mr fuller says that the ore has been pacing paying the operating expenses of the mine for some lime time and conse the indebtedness is not in ci easing |