Show car repa aers W 11 II not strike denver the first move towards a settlement bett lement of the denver rio grande shop men s strike was made at noon on tuesday when the corn com pany made new contracts alt with a corn com cittee representing the car repairers and inspectors the contracts are ef of from may I 1 to december 31 1908 and are practically the same as the contracts abrogated by the rail load company on march 15 athons had been made for calling all of the car men on the system out on strike and the signing of the con tracts has prevented that step |