Show installing new hoisting engine raymond illinois engine being replaced by margerone Lar larger gerOne one from the gemini lanager J 0 Sul sullivan livai has decided to purchase another engine for the raymond illinois mine to take the place of the one which was ras so badly wrecked on I 1 thursday of last week the engine which will be installed at once w m as purchased from the gemini company it is exactly the theace same ame kind of an en engine gine as the one at the godiva mine being of h p capacity with thia engine the raymond illi nois company will be able to sink to greater depth should the management decide upon such a course at some future date Thai The shaft is now down below the 1600 1500 foot level and most of the development work during the past few years has been upon this level the engine which was so badly dama damaged aed a ed last week did service at the great silver king mine at park city before being brought to tintic gintic it is S a good engine and may yet be repair ed and put into commission again it will require a cuple of weeks f more time to put the raymond illinois hoist in working order when the master wheel of the engine went to pieces the cage along with 2000 f ft t of cable dropped to the bottom of the shaft parts of the wheel and the drum ka or the biggest portion of it went straight up through the roof of the shaft house and came down upon the dump pieces of casting were thrown in almost every direction and one large chunk was sent flying between the timbers of the gallows frame had any of the larger pieces struck the gallows frame the timbers would have been cut in two like so many matches the flow of water in the raymond illinois is not heavy enough to do any damage while the changes and re pairs are being made to the hoisting equipment |