Show sioux con shaft j A N 4 ho is in charge of the development of the sioux cons property to the south of the colorado says that the shaft is now down a little over 60 feet mr says that the formation is identical with that of the colorado ground at the same depth and he expects to get the Col colorado crado ore at a depth of about feet j the new machinery with the ex caption of the boiler is being installed and the company expects to have everything every thing working within thirty days work on the pipe line which is to convey water to both the sioux cons and the lion king is now progressing rapidly and the water will be ready by the tune time it la is needed at these two mines i |