Show new shaft for the beck tunnel this week the ft A ork of graling out for the new working shaft tor for the B bk ck tunnel mine was started it will take a few weeks to do the necessary grading and then the sink ing of the shaft will start the shaft has been located on the line of the new railroad which m aich jessi knight and associates are preparing to build in TJ gintic and when the new road is 19 in working order the ore from this mine will be landed on the cars without any haul by team the new shaft s tj be located nearly 1000 feet arc fram in t te ie old workings which brings it in a in re central part of the ground |