| Show COUNTY WILL MILE CONCRETE ROAD on friday last the county commissioners ners in company with engineers from salt lake city went over the concrete road between willard and the springs for the purpose ot of determining whether or not the n work should be continued it was de aided to construct another mile of road work to be begin immediately one quarter of a mile ot of the road will be constructed on the south end of the present two mile stretch to brin bring tile the concrete road to tile the county lini lin at hot springs the other three tarse quarters of a mile will be added to the north end vt of the road already alread y con coll strutted ted the matter r of price of sand worried th the a commissioners for or a alm time because ot of the low bid made by salt lake parties who c can in deliver tile the saud sand at a much cheaper rate than can call local parties Part les this comes about th rousi i tile tho convenience 0 of a railroad built right into the sand pit at salt lake which eliminates the long haul from tile the pits to the railroad as is made necessary la in this city the salt lake lahe sand is not up to the quality ot of tle fie brigham sand but on oil account ot of the great difference in price that material will be used in tile the construction of the concrete road |