Show DRY BOTTOM RESERVOIR It is now settled that the Dry Bottom reservoir will b be constructed this year Citizens o othis of this city who own the land on the west side of the river have been pushing the enterprise for or some som sometime sometime e time past The They have secured d th the theland theland e land which will be coverer covered by the th e reservoir-about reservoir one thousand acres acre and and h have ve made a preliminary survey survey of of their canal The cana canal l will run a short distance below th the e ee town of Wales and will cover all th the e valuable land lanel along the West Nest mountains mountains moun between the point of the th e mountain and Manti The comple completion completion completion tion of this reservoir and canal wit will y greatly benefit this city as nearly all the land which will be reclaimed is wined by Ephraim people |