Show CONTRACT GOES TO DENVER FIRM the contract for the tile construction of the big steel bridge which is to span the duchesne river at myton has been awarded to the at J patterson construction company of denver while the contra contractor etor is given six months in which to complete the bridge an effort is to be made to have it finished before the high highwater water season provision is made ho however ever that the company must provide suitable means of crossing the river if the work is not done before highwater high water comes |